Date released: April 07, 2020
This is due to the current COVID-19 restrictions. The oral hearing was scheduled to be held in May.
Information in relation to the location and time of the rescheduled oral hearing will be notified to the applicant, all third parties who have made an objection on the proposed licence and the planning authority well in advance of the rescheduled hearing.
Further information on the oral hearing process is available on the EPA website.
Notes to Editor
The EPA issued a proposed licence on a revised licence to Irish Cement Limited, Castlemungret, Limerick, Co. Limerick on the 18th of September 2019, for the continued operation of a cement manufacturing plant and an associated inert landfill at Castlemungret, Co. Limerick (Reg. No. P0029-06).
The proposed licence provides for the acceptance of non-hazardous waste materials to be used as alternative fuels and raw materials, up to a maximum of 90,000 tonnes per annum. The proposed licence contains more than 100 individual conditions relating to the environmental management, operation, control and monitoring of the installation.
The EPA has considered the application and supporting documentation, including:
Public participation and consultation with statutory consultees was carried out during this EPA licence assessment process.
The EPA is satisfied that the emissions from the installation when operated in accordance with the conditions of the proposed licence will meet all required environmental protection standards and will not endanger human health or harm the environment in the vicinity of the installation or over a wider area.
Conditions imposed include:
The proposed licence was notified to the applicant, all third parties who made a submission on the application and other statutory consultees and is available on the EPA website. Six third party requests for an oral hearing, stating that they reflect the concerns of in excess of 4,000 people, were received and considered by the Board of the EPA. The Board considered that an Oral Hearing is merited given the scale, sensitivity of the local environment and the importance of the proposed development both nationally and regionally.
Further information on the licensing process can be found on the EPA website.
To receive all notifications on the application as soon as information is posted to the website, please sing up to the RSS Feeds: Information and how to Sign up for RSS Feeds