Summary: In 2009 the Environmental Protection Agency commissioned SKM Enviros to explore the technical and economic aspects of developing a National Difficult Waste Facility (NaDWaF), the principal component of which would be a hazardous waste landfill. Aspects of co-location with other waste infrastructure, as well as site selection criteria, are also considered